Skip to content
IRAS Times
Memory Lane
From probation2023 batch · 10 Sept 2026

An idea: one costing template for every workshop

Priya NairProbationer · NAIR, Vadodara

Every workshop we visited kept its own spreadsheet for unit costs. We drafted a common template and two workshops have adopted it. Proposing it here in case a zone wants to try it at scale.

During the workshop module at NAIR we visited five workshops across three zones. Each one costs its periodic overhauls, and each one does it in its own spreadsheet, with its own headings, its own treatment of overheads and its own idea of what a 'unit' is.

Comparing them was impossible, and comparison is the whole point of costing. So four of us drafted a common template: one sheet, fixed cost heads mapped to the accounting classification, and a standard basis for allocating shop overheads. We tested it on real data from two of the workshops, which have since adopted it for their monthly statements.

This is a proposal more than an achievement. If a zone would like to trial the template across all its workshops, we would be glad to help set it up, and gladder still to be told what is wrong with it. The draft is available through the NAIR faculty.

Reviewed and approved by the association on 10 Sept 2026

How did this land?

Be the first to react

0 comments

  1. No comments yet — start the conversation.

Comments are posted under your member name and may be moderated by the association.

Keep walking

More from Memory Lane

Share yours
  • Down memory lane1987 batch

    The night the ledgers were carried by lantern

    During probation at Madras we closed the March accounts by hand, with the power gone and a row of hurricane lamps along the desks. Nobody left before the trial balance agreed. I have never trusted a number as much as I trusted that one.

    R. VenkataramanRetired, PFA · Southern Railway0
  • From probation2023 batch

    A dashboard for divisional cash flow

    For our project at IRIFM we built a live cash-flow view for a division, reading straight from the accounts data. The DRM asked for it to stay on after we left. Small, but it is the first thing I built that a railway actually used.

    Ananya IyerProbationer · IRIFM, Secunderabad0
  • Down memory lane1994 batch

    My first footplate ride, as an accounts officer

    The Senior DFM insisted every probationer ride the footplate once. 'You cannot cost what you have not seen.' Thirty years on I still think about fuel and crew hours with the sound of that engine in my ears.

    Meenakshi RaoServing, FA&CAO · Western Railway0
Design preview: Sassy Pillars